EasyManua.ls Logo

GE Biacore X100 - Site Requirements

GE Biacore X100
93 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.1 Site requirements
WARNING
A fume hood or similar ventilation system shall be installed when
flammable or noxious substances are used.
WARNING
Explosion hazard. To avoid building up an explosive atmosphere
when using flammable liquids, make sure that the room ventilation
meets the local requirements.
Space requirements
The size of the instrument is indicated in the illustration below. At least 20 cm clearance
is required on all sides of the instrument to allow adequate air circulation. Space is also
required for the PC beside the instrument. The laboratory bench must be stable and able
to support the weight of the instrument.
40 Biacore X100 Operating Instructions 28961142 AD
4 Installation
4.1 Site requirements

Related product manuals