CHAPTER 5: SETTINGS CONTROL ELEMENTS
C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL 5-283
5
BRK 1 FLSHOVR SPV A to BRK 1 FLSHOVR SPV C — These settings specify FlexLogic operands (per breaker pole) that supervise
the operation of the element per phase. Supervision can be provided by operation of other protection elements, breaker
failure, and close and trip commands. A six-cycle time delay applies after the selected FlexLogic operand resets.
BRK FLSHOVR PKP DELAY — This setting specifies the time delay to operate after a pickup condition is detected.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE C70 and is the answer not in the manual?

GE C70 Specifications

General IconGeneral
BrandGE
ModelC70
CategoryProtection Device
LanguageEnglish

Related product manuals