C70 CAPACITOR BANK PROTECTION AND CONTROL SYSTEM – INSTRUCTION MANUAL 6-1
C70 Capacitor Bank Protection and Control System
Chapter 6: Actual values
Actual values
This chapter outlines viewing of data on the front panel and in the software.
6.1 Actual values menu
 ACTUAL VALUES
 FRONT PANEL
Access in EnerVista
See page 6-3
 ACTUAL VALUES
 STATUS
CONTACT INPUTS
See page 6-4

VIRTUAL INPUTS
See page 6-4
RxGOOSE BOOLEANS
See page 6-5
RxGOOSE DPS
See page 6-5
TELEPROTECTION
INPUTS
See page 6-5
CONTACT OUTPUTS
See page 6-5
VIRTUAL OUTPUTS
See page 6-6
RxGOOSE STATUS
See page 6-6
RxGOOSE
STATISTICS
See page 6-6
DIGITAL COUNTERS
See page 6-7
SELECTOR SWITCHES
See page 6-7

Table of Contents