EasyManua.ls Logo

GE Druck ADTS 405 - 3.7 Control or Measure Parameter

GE Druck ADTS 405
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
K114 Issue No. 9
3 - 12 Operation
3.8 Leak Testing the ADTS 405
It is important to check that the ADTS 405 and the connecting equipment does not
leak. Before use a leak check should be carried out as follows:
Connect the pitot and static hoses (to front panel of ADTS 405F). Temporarily seal the
free ends of the hoses.
Set the display to dual display, see 3.9.
Set the units to feet and knots, see 3.13.
Using the SETUP menu, choose the limits set for the aircraft or UUT, see 3.14.
Press SETUP, [LIMITS], and [NEXT] repeatedly to select the limit set from those
available.
Press [SEL] to save and then press CLEAR/QUIT repeatedly until the main
pressure screen shown below is displayed.
Note:
The numeric value of the parameters displayed change with each power-up
sequence. The amount of change depends on local atmospheric pressure
conditions at the time of power-up.
FIGURE 3-2 MAIN PRESSURE DISPLAY (LEAK MEASURE MODE)
Press the LEAK MEASURE/CONTROL key to turn on the pressure controllers.

Table of Contents

Other manuals for GE Druck ADTS 405

Related product manuals