System Start-Up
LOGIQ E9
User Guide
1-25
Direction 5454884-100 English
Rev. 1
Power Off
To power off the system:
1. Set the brake and use the operator panel movement
controls to lock the control panel in place.
2. When you shutdown the system, enter the scan screen and
lightly press the Power On/Off switch at the front of the
system once. The System-Exit window is displayed.
NOTE: DO NOT press and hold down the Power On/Off switch to
shutdown the system. Instead, lightly press the Power On/
Off switch and select Shutdown.
3. Using the Trackball, select Shutdown.
The shutdown process may take up to two (2) minutes and
is completed when the control panel illumination shuts
down.
NOTE: If the system appears non-responsive, press the Power On/
Off switch. After about six (6) seconds, the “Application not
responding” system dialog appears. Select to end all
system processes and shut down the system.
4. Disconnect the probes.
Clean or disinfect all probes as necessary. Store them in
their shipping cases or another appropriate probe storage
system to avoid damage.
NOTE: When the Extended Power Supply (EPS) is installed, battery
replacement may be necessary if the circuit breaker is turned off
for long periods of time (3 to 6 months).
Additional System Information
For optimum system operation, we recommend that you restart
the system at least once every 24-hour period. If you shut down
the system at the end of the day, no other action is needed.
HINTS
If the Park Lock does not engage when you attempt to
dock the Operator Panel in place, reset the Park Brake by
selecting “Park Brake Reset” in the Miscellaneous section
on the Utility -> System -> Peripherals page.
CAUTION
DO NOT turn off the circuit breaker before the Power On/Off
switch LED is off.
Data may be lost or system software damaged if the circuit
breaker is turned off before the Power On LED is off.

Table of Contents

Other manuals for GE LOGIQ E9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E9 and is the answer not in the manual?

GE LOGIQ E9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
Transducer Ports4 active ports
ConnectivityDICOM, USB, Ethernet
ApplicationsAbdominal, Vascular, Musculoskeletal, Small Parts, Urology, Pediatric, Cardiac, Obstetrics/Gynecology
TransducersLinear, Convex, Phased Array, Volume
Doppler ModesColor Doppler, Power Doppler, Pulsed Wave Doppler, Continuous Wave Doppler
ElastographyYes
Advanced FeaturesB-Flow, Volume Navigation
PortabilityCart-based system
Display19-inch high-resolution LCD monitor

Related product manuals