EasyManuals Logo

GE Multilin GEK-113000T User Manual

GE Multilin GEK-113000T
533 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #482 background imageLoading...
Page #482 background image
GE Multilin F650 Digital Bay Controller D-7
APPENDIX D D.1 IEC 60870-5-104 PROTOCOL
D
Table D–1: OPERATIONS:
Table D–2: CLOCK SYNCHRONIZATION:
The date in the answer is the same as the received in the command.
The relay date is synchronized after performing this command.
Table D–3: RESET OF PROCESS
QRP_RESET_GRAL: General reset of process.
Table D–4: ACQUISITION OF TRANSMISSION DELAY:
The date in the answer is the same as the received in the command.
OPERATIONS
POINT DESCRIPTION
C_SC_NA_1
3000 – 3011 Command OFF
3000 – 3011 Command ON
CLOCK SYNCHRONIZATION
POINT DESCRIPTION
C_SC_NA_1
0 Set Date
RESET OF PROCESS
POINT DESCRIPTION
C_RP_NA_1
0 Reset of Process
DELAY ADQUISITION
POINT DESCRIPTION
C_CS_NA_1
0 Delay Acquisition

Table of Contents

Other manuals for GE Multilin GEK-113000T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Multilin GEK-113000T and is the answer not in the manual?

GE Multilin GEK-113000T Specifications

General IconGeneral
BrandGE
ModelMultilin GEK-113000T
CategoryController
LanguageEnglish

Related product manuals