GEDA
®
Temporary Construction Hoist PH 650
Operating Manual Page 20 of 64 BL148GB2017 / 11
5.7 Do not transport suspended loads above the hoist
The operating company must use appropriate organisational measures to
ensure that no suspended loads are transported above the hoist.
5.8 Preparing an emergency/evacuation plan
The operating company must prepare an emergency/evacuation plan and
train all relevant persons in this plan and provide appropriate instructions.
5.9 Training assembly engineers from other companies
Before undertaking any work, assembly installers from other companies
must be informed by the operating company about obligatory safety
regulations, valid accident prevention guidelines as well as the hoist's
functions and safety equipment. The corresponding instructions/manuals
must be made available.
5.10 Following the instructions of GEDA assembly engineers
If the hoist is installed by GEDA assembly engineers, their instructions
must be followed.
5.11 Provision of personal protective equipment
The operating company must provide personal protective equipment
appropriate to the respective place of use and purpose.
Protective equipment must be checked at regular intervals to ensure
function and completeness.
In addition to this information, all national and employer liability insurance
regulations relating to protective equipment must be observed.