EasyManua.ls Logo

GEDA PH 650 - Monitoring Locking of the Assembly Crane

Default Icon
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GEDA
®
Temporary Construction Hoist PH 650
Operating Manual Page 61 of 64 BL148GB2017 / 11
13.2.4 Monitoring locking of the assembly crane
During travel, the assembly crane must not swing into the path of travel
(mast). Thus, this must be locked in a secure position.
The locking bolts (1) removed interrupt the safety circuit and the car
will not move.
Push the locking bolts (1)
towards the bracket and lock.
The locking bolts (1) must be removed if no assembly crane is
installed.
1

Table of Contents

Related product manuals