GEDA
®
Temporary Construction Hoist PH 650
Operating Manual Page 52 of 64 BL148GB2017 / 11
Open the roof hatch (4) and, if
necessary, secure it against
shutting using appropriate
measures, e.g. by a strong wind.
A bar (5) is installed to ensure safe entry onto
and exit from the roof.