EasyManua.ls Logo

Getinge MP-129 Series - Pump Motor; Water-Saver I;F Box; Solenoid Valve

Getinge MP-129 Series
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MP-129F Installation
38
Pump Motor 1. Remove the cover plate from the junction box on the side of
pump motor 1B.
2. Verify the pump is wired for 120 VAC as shown on the
wiring diagram.
230 VAC CONVERSION PACKAGE
If the water-saver will be connected to 230 VAC power:
1. Replace the overload relay.
2. Replace the cover plate.
3. Route the wires from pump motor 1B to Water-Saver I/F
Box 11A and connect as shown on the wiring diagram.
Water-Saver I/F Box 1. Route a 120VAC, 60Hz, 30AMP (or 230VAC, 60Hz,
15AMP) power source to Water-Saver I/F Box 11A and
connect to terminals 1, 3, and GRN on 1K.
2. Check the pump motor for proper rotation when electrical
power is supplied to Water Saver I/F Box 11A.
See "CHECKING THE ROTATION OF THE PUMP MOTOR" on
page 3-9.
Solenoid Valve Connect Water-Saver ON valve 15SV to 15JO on Control Box
2A.

Table of Contents

Related product manuals