EasyManuals Logo

Gossen MetraWatt SECUTEST PRO User Manual

Gossen MetraWatt SECUTEST PRO
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #67 background imageLoading...
Page #67 background image
GMC-I Messtechnik GmbH 67
10.5 Connecting the DUT
Connect the DUT to the test instrument in accordance with
the selected test sequence.
– Test socket
– Permanent Connection
– Adapter
Note concerning use of the AT3-IIIE test adapter
Please note that polarity reversal with the help of the utilized test
instrument is not active when the AT3-IIIE adapter is used for test-
ing single-phase DUTs (socket 3 / earthing contact). In this case,
all leakage current measurements must be performed manually
with the plug in both directions.
Switch settings A1 ... A7, AUTO
Connection depends on the type of DUT (see the respective con-
nection type in the classification parameters tables).
Switch position A8
For testing extension cords in accordance with standards: con-
nection to the test socket via the following adapter:
EL1: For single-phase extension cords
VL2E:
For single and 3-phase extension cords
10.6 Selecting a Test Object
If no DUT has been selected in the initial display, enter its ID
number (for example using a barcode scanner) after selecting
ID.
Alternatively, activate
the database view with the MEM
key.
Select the DUT for the test sequence with the scroll keys.
Return to the measuring view by pressing the ESC key.
10.7 Checking Connection and Starting the Test Sequence
Trigger the connection test and the test sequence
by pressing the START key.
The following checks are run automatically before the
test sequence is started:
•Probe Test
(as to whether or not to test probe P1 is connected
and use link
P1 is intact
)
Attention!
!
If the fuse at test probe P1 is defective, all subsequent
measurements using this measuring path are incorrectly
evaluated as good!
Insulation test (whether or not the DUT is set up in a well-insu-
lated fashion)
On test and short-circuit test
(prerequisite: “short-circuit test L-N” sequence parameter is
preset to “on”.
In order to be able to detect a short-circuit at the DUT, testing
is conducted between L and N, as well as LN and PE.
Note
If you deselect important test steps under sequence param-
eter (set to off), the test sequence might not fulfill the require-
ments stipulated by the standard any more.
If you have set the
Detected classification
” parameter for the
respective test sequence to “Always accept” and the “
Auto-
detection of
” parameter to “
Connection and PC
” (before trig-
gering Start), the following additional checks will be run
before the test sequence is started:
Protection category detection for DUTs with protective conductor
*
Connection test *: Checks whether the DUT is connected to
the test socket. In the case of protection category I: whether
or not the two protective conductor terminals are short-cir-
cuited.
*Applies to
M7050
with feature B00 and B09
10.8 Executing and Evaluating Test Steps
Manual evaluation of visual inspection
(prerequisite: “visual inspection” sequence parameter is preset to
“on”.)
Evaluate the visual inspection.
If you mark even one visual inspection as not passed
with the key shown at the right, the sequence is aborted and
the test is evaluated as not passed.
Resume the test sequence.
Connecting Line Voltage
Connecting line voltage to the test socket at the test instrument
and performance of a function test are only permissible if the DUT
has already passed the safety test (protective conductor resis-
tance and insulation resistance measurements)!
Do not start measurements at your test instrument unless it’s in
plain view. Do not connect line voltage to the test socket of your
test instrument before the surrounding area has been secured.
Test Steps with Manual Evaluation (e.g. R
PE
)
Observe instructions which appear at the display, e.g.
prompting to contact parts with test probe P1.
If the measured value appears green at the display, it lies within
the limits specified by the standard.
The measured value recording symbol appears in the
softkey bar. The 0 indicates that no measured values
have thus far been saved to buffer memory.
Each time this key is pressed, the measuring or evaluation
procedure is restarted.
Initially, the digit blinks (here a 1 without symbol) until
the measured value settles in. The evaluation cycle is
visualized as follows: the progress bar starts at the left-
hand edge of the display and moves to the right. When
it reaches the rightmost position, evaluation has been
completed and the symbol shown at the right appears
with the current number.
Depending on whether you want to delete the last
value saved to the clipboard or all values, press the
symbol with the wastebasket shown at the right an ap-
propriate number of times.
Proceed to the next measurement by pressing the key
shown at the right.
MEM
ESC
0
1
1

Table of Contents

Other manuals for Gossen MetraWatt SECUTEST PRO

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gossen MetraWatt SECUTEST PRO and is the answer not in the manual?

Gossen MetraWatt SECUTEST PRO Specifications

General IconGeneral
BrandGossen MetraWatt
ModelSECUTEST PRO
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals