OPERATION 
107 
Automatic Tests 
This section describes how to create, edit and run automatic tests. 
Automatic tests allow you to link up to 10 different MANU tests 
and run them sequentially within a single AUTO test. Each stored 
MANU test is used as a test step when creating an AUTO test. In 
addition, up to 5 groups of AUTO test can be interconnected 
together to present an ever-advanced AUTO tests. 
  Choose/Recall an AUTO Test→ from page 108 
  Creating an AUTO Test File Name → from page 109 
  Adding a Step to the AUTO Test → from page 110 
  Continuous AUTO Tests → from page 112 
  AUTO Test Page Editing → from page 114 
  Running an Automatic Test → from page 120 
  Automatic Test Results → from page 126 
 
Before operating the GPT-10000 please read the safety precautions 
as outlined in the Set Up chapter on page 22.