EasyManua.ls Logo

HALE RSD - Page 173

Default Icon
177 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C-11
DO NOT LUBRICATE VANES OR VANE SLOTS. USING LUBRICANT ON THE VANES OR
VANE SLOTS DURING DISASSEMBLY, CLEANING, OR ASSEMBLY EVENTUALLY CAUS-
ES A GUMMY RESIDUE TO DEVELOP, RENDERING THE SYSTEM INOPERATIVE.
Slide new vanes into slots in rotor. 3.
Rotate rotor and shaft, verify vanes move freely in rotor slots. 4.
NOTE
If required, install new pins in the pump head assembly.
B. Install pump head onto pump body.
Align pins with holes in pump body and slide pump head over rotor/shaft. 1.
Once head is seated against pump body, make sure rotor turns freely in 2.
pump.
C. Install motor on pump and secure.
Install one (1) 3/8-in 16 UNC X 2-1/2 in long bolt. 1.
NOTE
Install wiring according to tags/notes/match marks.
Install nut (3/8-in 16 UNC) to connect pump head to pump body. 2.
Tighten nut and bolt. See Table 22. 3.
D. Connect hose(s) according to tagging.
E. Connect wiring according to tagging.
F. Install primer on mounting point and secure primer according to OEM instruc-
tions.

Table of Contents

Related product manuals