Installation
Chapter 1: Introduction
Page 1 - 4 Electrically Operated General Ward Bed
Operation and Maintenance Manual (154588 REV 1)
7. Keep the power cable combination a safe distance from bed frame parts
that move. Keep the power cable wound on the storage hooks (see figure 1-
2 on page 1-4).
Figure 1-2. Power Cable Location
8. Plug the bed plug into an applicable power supply.
9. Do a bed function check. Go to RAP 2.1. on page 2-7.
10. Clean the bed. Go to “Clean and Disinfect” on page 6-1.