4.2 HI/LO Actuator
Chapter 4: Removal, Replacement, and Adjustment Procedures
Page 4 - 4 Electrically Operated General Ward Bed
Operation and Maintenance Manual (154588 REV 1)
4.2 HI/LO Actuator
Tools required: Screwdriver
#2 phillips screwdriver
Pliers
Bed stands or bed jack
Removal
Failure to unplug the unit from its power source could cause injury or
equipment damage.
1. Unplug the mains power.
2. Lock all functions at the attendant control panel.
3. Set the brakes.
4. Support the mattress frame with a bed jack, bed stands or other approved
device (see figure 4-3 on page 4-4).
Figure 4-3. Support the Frame