Cabling and powering up the enclosure  56 
Cabling and powering up the enclosure 
Cabling the enclosure 
After all system hardware is installed, cable the components. See the HP ProLiant BladeSystem c-Class Site 
Planning Guide on the Documentation CD or the HP website (http://www.hp.com) for additional cabling 
and site planning requirements. 
 
 
WARNING: To reduce the risk of electric shock or injury due to high-current electrical energy, be 
sure that all power is completely disconnected at the source before beginning any power 
connections to the power bus bars or power bus box. 
 
 
 
WARNING: 
Be sure that all circuit breakers are locked in the off position before connecting any 
power components. 
 
To cable the system: 
1.  Connect the Onboard Administrator modules. 
2.  Connect the network cables to the interconnect modules. See the documentation that ships with the 
interconnect modules, or the HP ProLiant BladeSystem c-Class Site Planning Guide on the 
Documentation CD or the HP website (http://www.hp.com/go/bizsupport). 
3.  Connect to the AC or DC power source in your facility and power up the enclosure ("Powering up the 
enclosure" on page 59). 
 
Onboard Administrator cabling