4. Connect all peripheral cables to the server.
5. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
6. Power up the server.
Install the front bezelInstall the front bezel
ProcedureProcedure
1. Insert the tabs on the bezel into the slots on the front chassis.
2. Close the front bezel.
3. Lock the front bezel.
Position the tower server for operationPosition the tower server for operation
ProcedureProcedure
Return the server to an upright position.