LUNA2000-200KWH-2H1 Smart String ESS
User Manual
4 SmartLogger Web-based Deployment
Copyright © Huawei Technologies Co., Ltd.
If the software version of ESM-1 to ESM-12 is not FusionSolar V800R021C10SPC110 or later,
upgrade the ESU.
Obtain the upgrade package from the Company.
Step 6 (Optional) Choose Maintenance > Software Upgrade, upload the upgrade package, select
the device, and upgrade the ESU.
Step 7 Choose Monitoring > ESU > Running Param., click in the upper right corner, and
wait for 2 minutes.
Step 8 Choose Monitoring > ESM and check in the upper right corner to ensure that no major
alarm is generated.
----End
4.5 Deployment Wizard
Procedure
Step 1 Log in as admin to access the deployment wizard page.
Step 2 Set parameters following the deployment wizard. For details, see Help on the page.
During parameter setting, click Previous, Next, or Skip as required.
1. Set basic parameters.
After setting the parameters, select a communication mode based on the site
requirements.
2. After Huawei devices are connected, click Search for Device to check the cable
connections and allocate addresses.
During the process of Search for Device, do not perform upgrade operations (such as upgrading
through the app, management system, or WebUI).
When you click Search for Device, cable connections (DC and AC) will be checked before device
search (not applicable to third-party devices), and device addresses will be automatically allocated.
After the cable connection check and device search are complete, if a cable connection alarm is
generated, you can click the alarm icon to view the corresponding alarm information.
If an alarm is generated when the cable connection check fails, click the alarm icon to view
the alarm cause and handling suggestions. After the fault is rectified, check the cable connection
again.
After the cable connection check and device search are complete, click to view the
corresponding topology information.
After a device is added or deleted, you need to click Search for Device again. Otherwise, the system
topology will not be updated.
3. If a meter is connected, set Meter usage to Export+import meter.
4. Connect to EMIs.
5. Set the battery working mode for battery control.