Remove the ropes after ensuring that the container is placed evenly
on the container bases.
Do not drag steel ropes or lifting appliances. Do not collide with the
equipment.
Secure the unit you have hoisted before hoisting another unit.
2.8 Installation
2.8.1 Installation Preparations
2.8.1.1 Preparing Tools
The tool pictures are for reference only.
The tool tables may not list out some tools required onsite. Onsite installation personnel and the
customer need to prepare the tools based on the site requirements.
Installation Tools
Phillips insulated
torque screwdriver
Insulated torque socket
wrench (including an
extension bar)
Socket
specifications: 7–19
mm
Socket depth ≥ 32
mm
The socket
connector matches
the torque wrench.
Torque range:
1.2–45 N·m
Flat-head insulated
torque screwdriver