LUNA2000-200KWH-2H1 Smart String ESS
User Manual
Copyright © Huawei Technologies Co., Ltd.
Conductor
Cross-Sectional
Area
The specifications of the PE cable are subject to this table or calculated according to IEC 60364-5-54.
Procedure
Step 1 Open the ESS cabinet door.
Step 2 Connect the PE cable.
Figure 2-42 Connecting a PE cable
----End
2.8.3.2 (Optional) Outside the Cabinet
Using a Flat Steel Sheet
The hot-dip zinc-coated flat steel sheet needs to be prepared by the customer. The
recommended specification is ≥ –40 x 4. The specific dimensions depend on the onsite fault
current and are subject to the design of the design institute.