LUNA2000-200KWH-2H1 Smart String ESS
User Manual
Copyright © Huawei Technologies Co., Ltd.
Figure 2-76 Connecting AC Power Cables
----End
2.9.7 Installing a Single-phase AC Input Power Cable (without
External Grid Power Supply)
If a UPS or other reliable backup power supply is used, perform the following steps to connect
single-phase AC input power cables.
Recommended UPS input switch specifications: 230/400 V AC 32 A/2P.
Step 1 Remove the short-circuiting bar from 1–2 and insert it to 2–3 on the XU terminal block.
Step 2 Remove the short-circuiting bar from 4–5 and insert it to 5–6 on the XU terminal block.
Step 3 Connect the cable.