LUNA2000-200KWH-2H1 Smart String ESS
User Manual
Copyright © Huawei Technologies Co., Ltd.
Figure 2-38 Document position
Step 6 Take out the mounting kits delivered with the product.
After opening the door, check the number of deliverables based on the packing list. If any deliverable is
missing, contact your dealer immediately.
Table 2-26 List of mounting kits
Hoisting conversion bracket
and screw
Anchor bracket, anchor bracket
screw, and expansion bolt
Step 7 After closing the cabinet door, move the ESS to the specified position.
If a forklift cannot be used on the transport route (for example, there is a slope), use a crane to move the
ESS.