LUNA2000-200KWH-2H1 Smart String ESS
User Manual
Copyright © Huawei Technologies Co., Ltd.
Figure 2-70 Removing covers
Step 2 Connect the preinstalled cable to the BAT/BUS ports. Magnetic rings are delivered with the
product.
The black magnetic ring is installed on the left side of the rack controller, and the green
magnetic ring is installed on the right side of the rack controller.
Do not remove the cover from an unused pagoda connector.
Figure 2-71 Connecting cables