EasyManua.ls Logo

Huawei UPS5000-E-30 kVA-FM - Installing Batteries; Installing Optional Components; Installing Antiseismic Kits

Huawei UPS5000-E-30 kVA-FM
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.3.2 Installing Batteries
D ANGER
Before installing batteries, read through the battery safety precautions and
install batteries as instructed in the delivered battery installation guide.
Install the batteries from the lower layer to the upper layer to ensure the
system is secure and balanced.
Install a battery rack and batteries. For details, see the battery installation guide
delivered along with the batteries.
3.3.3 Installing Optional Components
3.3.3.1 Installing Antiseismic Kits
Procedure
Step 1 Determine the installation positions for the antiseismic kits based on the delivered
marking-o template, and mark mounting holes.
Figure 3-15 Antiseismic kit mounting hole positions
Step 2 Secure two antiseismic kits to the front and rear of the cabinet using twelve
M5x16 screws and four M12 screws.
UPS5000-E-(30 kVA–120 kVA)-FM
User Manual 3 Installation
Issue 03 (2022-01-30) Copyright © Huawei Technologies Co., Ltd. 60

Table of Contents

Related product manuals