EasyManua.ls Logo

Huawei USG6000E Series - Page 528

Huawei USG6000E Series
610 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Tools
Phillips screwdriver
Multimeter
Procedure
Step 1 Loosen and remove the screw of the ground terminal on the USG rear panel.
Step 2 Connect the OT terminal at one end of the PGND cable to the connection hole of
the USG, with the conducting wire upward, and tighten the M4 screw, as shown in
A of Figure 5-11, and tighten the M4 screw. The tightening torque is 1.4 N·m.
Figure 5-11 Installing the OT terminal
NO TE
The ground cable of the USG6510E, USG6510E-POE, USG6530E must be routed upwards.
Step 3 Connect the M6 end of the PGND cable to the ground terminal of the cabinet,
workbench, or wall. The tightening torque of the M6 screw is 4.8 N·m.
HUAWEI USG6000E Series
Hardware Guide 5 Hardware Installation
Issue 08 (2022-04-20) Copyright © Huawei Technologies Co., Ltd. 521

Table of Contents

Other manuals for Huawei USG6000E Series

Related product manuals