P12
Commissioning an Installation
This section presents the required steps for commissioning a new installation or modifying an
existing installation.
Commissioning Steps:
STEP ACTION PAGE
1: iCANnet control wiring 13
2: Power down the Switched Relay Controller, remove
door and visually inspect all wiring and components 15
3: Wire the Switched Relay Controller 16
4: Replace door on the Switched Relay Controller and
power the unit 18
5: Energize each Output one at a time to determine the
location, type and current draw of its load 19
6: Congure Output behaviors 20
7: Verify proper control of each Output using the Output
Override option 23
8: Congure Scene Values 24
9: Edit the Emergency Scene 25
10: Connect and congure contact inputs 26
11: Congure wallstations using the Wallstation Wizard 27
12: Verify each wallstation 29
13: Enable the timeclock 29
14: Congure the time, date, coordinates and
daylight saving time 30
15: Congure timeclock events 32
16: Congure Ethernet 34
17: Congure DMX 35
18: Congure passwords 36
19: Commissioning complete