System-Related Functions
Copyright ©ITECH Electronic Co., Ltd. 115
Before connecting the cables, ensure that the instrument power switch is off
and the main switch of the AC power input (distribution box) is off.
Before connecting 3 single instruments to the AC distribution box, ensure
that the distribution box capacity is sufficient. Refer to the corresponding
specifications for the AC input parameters of a single instrument.
For 3U models, the same model can be connected in parallel. Taking three 3U
single instruments (with operation panel) as an example, the steps for parallel
operation are as follows.
2. Ensure that the power switches of the three units and the main switch of the
AC power distribution box are off.
3. Refer wiring connection diagram to connect three units.
For long distance testing requirements:
For short distance test requirements:

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ITech IT7900P Series and is the answer not in the manual?

ITech IT7900P Series Specifications

General IconGeneral
BrandITech
ModelIT7900P Series
CategoryPower Supply
LanguageEnglish

Related product manuals