EasyManua.ls Logo

JRC JCX-161 - Operation Check with External Equipment; VDR Output

JRC JCX-161
134 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Operation check
JCX-161 BNWAS Installation Manual
109
7ZPNA4321
Item Operation and operation Check content
NCD-2257 Wait to pass dormant period. The visual indication starts. (The LED lamp
blinks.)
The 1st Stage Bridge audible alarm start in 15
seconds. (The LED lamp blinks short.)
Press [DIM] button. The brightness of the LED lamp changes.
Select [BUZZER TEST] in the menu,
and then set the CH1(VISUAL) to
ON.
The LED lamp lights on.
NVS-785 After the dormant period passed, wait
to start the 2nd/3rd Stage Remote
audible alarms.
The LED lamp lights on and the buzzer sounds.
Select [BUZZER TEST] in the menu,
and then set the CH2(1ST BUZZER)
– CH8(3RD BUZZER)to ON.
The LED lamp lights on and the buzzer sounds.
5.3 Operation check with external equipment
5.3.1 VDR output
Check the BNWAS serial output with the VDR maintenance software.
Item Operation Content of check
Output at state
change
Press the reset button. A corresponding ALR sentence is
outputted.
Periodic output The operation is unnecessary. The ALR sentence for showing no
warning is outputted with every 55
seconds.
An internal information (PJRCL/M)
sentence is outputted with every 1
minute.
Setup the VDR to acquire ALR sentences and "Remote Maintenance" (PJRCL/M) sentences.
Setup the VDR maintenance software
Setup Equipment Sentence Time out
VDR ALR 120 [s]
RMS PJRC 120 [s]

Table of Contents

Other manuals for JRC JCX-161

Related product manuals