Marked areas
• Lift the aluminum cover and discon-
nect all pneumatic, hydraulic and
electrical connections.
Removing the aluminum cover
• Remove the force on the pins in the
connection area by lifting the axle
area in a controlled manner.
As long as the connections
under the aluminum cover are
not installed, the lowering/lif-
ting operation cannot be
performed.
• Remove the pin fixing brackets.
Removing the pin fixing brackets
• Carefully remove the pins from their
sockets.
• Carefully separate the axle area
from the platform with the help of a
crane and place the aluminum sup-
ports under the axle area in their
new position.
• Place the aluminum supports under
the front platform by changing the
connection points of the intermedi-
ate platform as shown in the picture.
Placing the aluminum supports
• Remove the force on the pins in the
connection area by lifting the inter-
mediate platform in a controlled
manner.
• Remove the pin fixing brackets.
Removing the pin fixing brackets
• Carefully remove the pins from their
sockets.