:INIT (:CALibration:PROTected:INITiate)
Purpose To initiate comprehensive and factory calibration procedures.
Format :cal:prot:init
Description The :INIT command enables Model 2010 calibration when performing these
procedures over the bus. This command must be sent to the unit after sending
the :CODE command, but before sending any other DC, AC, or
manufacturing calibration command.
Note The :INIT command should be sent only once before performing either DC,
AC, or factory calibration. Do not send :INIT before each calibration step.
Example :CAL:PROT:INIT Initiate calibration.
:LOCK (:CALibration:PROTected:LOCK)
Purpose To lock out comprehensive or manufacturing calibration.
Format :cal:prot:lock
Description The :LOCK command lets you lock out both comprehensive and
manufacturing calibration after completing those procedures. Thus, :LOCK
performs the opposite of enabling calibration with the :CODE command.
Note To unlock comprehensive calibration, send the :CODE command. To unlock
manufacturing calibration, hold in the OPEN key while turning on the power.
Example :CAL:PROT:LOCK Lock out calibration.
:LOCK? (:CALibration:PROTected:LOCK?)
Purpose To read comprehensive calibration lock status.
Format :cal:prot:lock?
Purpose 0 Comprehensive calibration locked.
1 Comprehensive calibration unlocked.
Description The :LOCK? query requests status from the Model 2010 on calibration
locked/unlocked state. Calibration must be enabled sending the :CODE
command before calibration can be performed.
Example :CAL:PROT:LOCK? Request cal lock state.
Calibration Command Reference B-5