EasyManuals Logo

Keysight Technologies E7515B UXM 5G User Manual

Keysight Technologies E7515B UXM 5G
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
Getting Started Guide 31
Quick Start
Instrument Location and Rack Mounting Requirements
VENTILATION REQUIREMENTS: When installing the instrument(s) into a
cabinet consideration shall be given to the convection flow into and out of the
cabinet. Consideration shall also be given to the individual instruments to avoid
having the heated discharge of one instrument, now becoming the cooling
intake air for another instrument.
Another area of concern is verification that the maximum ambient operating
temperature of the instrument(s) is not exceeded by cabinet installation.
Keysight recommends forced air convection whenever instruments are
installed in a cabinet and further recommends that the maximum operating
temperature of the cabinet be reduced 10°C from the lowest maximum
operating temperature of a single instrument.
If there are any concerns or special requirements a Keysight Field Engineer
should be consulted to assure instrument(s) temperature compliance and
performance.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Keysight Technologies E7515B UXM 5G and is the answer not in the manual?

Keysight Technologies E7515B UXM 5G Specifications

General IconGeneral
BrandKeysight Technologies
ModelE7515B UXM 5G
CategoryTest Equipment
LanguageEnglish

Related product manuals