PLZ-U Installation and Preparation 2-9
2.6 Power Up
Operation check
1. Turn off ( ) the POWER switch.
2.
Check that the power cord is correctly connected.
See sections 2.5, “Connecting the Power Cord.
3.
Check that nothing is connected to the DC INPUT (load input terminal)
on the front and rear panels.
Fig. 2-6 Model and version conrmation screen (example)
4.
Turn on ( ) the POWER switch.
All the LEDs illuminate once, and the model and version are displayed.
The model and version are displayed for approximately 1 second. Then,
the load unit displays the measured value, and the frame displays the
preset value.
The power-up operation takes up to 2 seconds per channel depending on
the length of the sequence program.
5.
Check the channel number display of the load unit.
Channel numbers are assigned to installed slots in order from the left facing
the front panel.
The measured value displayed on the load unit indicates coarse zero.
6.
Press the LOAD key of the frame and check that the LED located above
and to the left of the key illuminates.
7.
Press the LOAD key again and check that the LED located above and
to the left of the key turns off.
Frame model
Frame version
Load unit model
Load unit version
Channel number of
the load unit
Channel number of the
selected load unit
70UA
150U
30F
50F
NOTE

Table of Contents

Other manuals for Kikusui PLZ-U Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kikusui PLZ-U Series and is the answer not in the manual?

Kikusui PLZ-U Series Specifications

General IconGeneral
BrandKikusui
ModelPLZ-U Series
CategoryControl Unit
LanguageEnglish

Related product manuals