2L6/2N6/2N5/2N4
1-4-52
Checking
procedure at the
occurrence of
J46XX
Corrective action at the occurrence of
J46XX
On/Off control signal output connector
(terminal), point of checking connection
1 Items for Initial Checks see page 1-4-29
2
Eject full sensor (EFS) : Conduct
connectivity check, mounting location
check, operation check (U031)
Front PWB YC5-16
3
feedshift solenoid (FSSOL): feedshift
guide check (U033)
Front PWB YC5-19
4
Eject motor (EM) : Operation check
(U030)
Front PWB YC5-8 to 11
5
Front PWB (FRPWB): Replace
6
Engine PWB : Replace
Checking
procedure at the
occurrence of
J47XX
Corrective action at the occurrence of
J47XX
On/Off control signal output connector
(terminal), point of checking connection
1 Items for Initial Checks see page 1-4-29
2
Switchback sensor (SBS) : Conduct
connectivity check, mounting location
check, operation check (U031)
Front PWB YC5-13
3
feedshift solenoid (FSSOL): feedshift
guide check (U033)
Front PWB YC5-19
4
Job separator eject motor (JSEM):
Operational check (U030)
JS main circuit PWB: YC2-4, 5, 6, 7,
YC-1 Feed PWB 1: YC20
5
Engine PWB : Replace Engine PWB : YC7 Front PWB : YC3