Engineering tool »EASY Starter«
The »EASY Starter« is a PC sow
are that is especially designed for the commissioning and
diagnoscs of the inverter.
»E
ASY Starter« Download
Sample screenshot:
The v
e main commissioning steps are shown in order towards the top of the Sengs tab.
Clicking on a link displays a corresponding interface containing the most important parameters
that need to be set.
Commissioning step Descripon of the sengs
Basic seng Sengs f
or adjusng the inverter to a simple applicaon based on the default sengs.
Communicaon Sengs for communicaon via the on-board EtherCAT, another network opon, and the engineering port X16 (PC
interface).
Kinemacs Basic sengs of the technology applicaon for adjusng the motor end and load side (gearbox rao, mounng
direcon, moments of inera, etc.)
Moon Basic sengs of the technology applicaon for adjusng the moon control.
Technology applicaon Sengs for adjusng the technology applicaon for the applicaon.
Parameter elds
The par
ameters are sorted themacally.
The currently set parameter values are displayed.
Fields highlighted in yellow indicate an online connecon to the device.
Pressing the [F1] key opens the program help.
Commissioning
Oper
ang interfaces
Engineering tool »EASY Starter«
168

Table of Contents

Other manuals for Lenze I95AE222F

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lenze I95AE222F and is the answer not in the manual?

Lenze I95AE222F Specifications

General IconGeneral
BrandLenze
ModelI95AE222F
CategoryInverter
LanguageEnglish

Related product manuals