20 CHAPTER 3: SETTING INTO OPERATION
TRYTON 107/112
1. TRANSPORTATION
Risk of injury from heavy components!
Take note of the weight of the components.
Use an appropriate forklift truck to lift and transport the heavy components.
1.1. Description
Depending on its destination, the TRYTON 107/112 bar feeder may be delivered either on a pallet
or packed in a wooden crate.
When transported by sea or air, the second solution is recommended.
Depending on swing over bed
1.2. Unpacking
For practical and safety reasons, the bar feeder must be unpacked in a spacious, well-lit location.
Risk of injury from heavy components!
Take note of the weight of the components.
Check that the forklift truck's lifting capacity is sufficient.
Ensure that no one is in the vicinity of the suspended load or within
the operating range of the forklift truck.
1) If the bar feeder is received in a crate,
start by unscrewing the front panel.
2) Remove the top.
3) Remove the side walls.
From this point on, the bar feeder is unpacked
the same way as when it is delivered on a pallet.