Harvest Header
Pre-Delivery Checklist
HEADER:
SeriaJ
Number _
COMBINE
ADAPTER:
Serial
Number,
_
Perlorm these checks
and
adjustments prior
to
delivery to your customer. See
the
Operator's Manual
for
adjustment
detaUs.
CAIJTlON:
Carefullyfollow
the
inslnJctions
given.
Bealert for safetyrelated messages
which
bring
yc:D"
attention
to
hazards
and
unsafe practices.
Check
that
header is level.
Check
wobble
box
lube level.
Check hydraulic oil level in adapter reservoir. (Straight Cut Only)
Set
reel speed
to
maximum and operate header siclde and draper drives slowly
for
5 minutes.
9.5l-14 tire: 42 to 46 psi (290 to 315 kPa)
Check draper tension.
Run machine at operating speed
for
15
minutes, STOP ENGINE and check for beltjk:lJer alignment and
heated bearings. Check siclde sections
for
discolouration caused
by
misalignment of components.
Check lights are functional.
Bleed reel lift cylinder.
Check hydraulic hose and wiring harness routing, ensuring adequate clearance with header
up
or
down. Be sure
colour
coding on hydraulic hoses is matched and that all hydraulic connections are fully
engaged.
Check
that header delivery opening is adjusted
to
align with combine feeder house opening.
(Straight
Cut
Only)
Check that rear
of
feeder draper moves
up
and down freely. (Straight Cut Only)
Grease all bearings
and
drivelines.
Install breather in
wobble
box.
Check
for
shipping damage
or
missing parts.
Adjust reel fore-aft position.
Adjust
reel
clearance from cutlerbar.
(2
inches
[50
mm})
Check gauge wheel bolt torque. (Units with gauge wheels.)
4
bolt hub: 55 hJbs,
(75
N,m)
6 bolt hub: 85 hJbs, (115
N,m)
Check header flotation.
(SO
to
70
Ibs.
[220
to
300
N))
Check tire
pressure.
(Units
with
gauge
wheels.)
6.70-15 tire:
24
to
28 psi (165 to 195 kPa)
Check
sickle
drive bell
tension.
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Date Checked:. _
Checked by: _