EasyManua.ls Logo

M&C EC-30C - Page 6

M&C EC-30C
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EC-30C | 1.00.02 +49 2102 935 888 www.mc-techgroup.com 5
Table of Illustrations
Fig. 1: Application example of the EC-30C 11
Fig. 2: Jet-Stream heat exchanger 12
Fig. 3: Front view: dimensions including optional peristaltic pumps 16
Fig. 4: Side view: dimensions including optional peristaltic pumps 16
Fig. 5: Graphic user interface 18
Fig. 6: Smiley symbols during self-test 19
Fig. 7: The smileys on the display after self-testing 19
Fig. 8: ‘Service‘-monitor: Self-test failed 20
Fig. 9: Start-up phase: first cooling phase 21
Fig. 10: Start-up phase: TKS reaches and/or exceeds ‘0 °C / 32 °F’-limit 22
Fig. 11: Start-up phase: Target temperature reached 22
Fig. 12: That’s how you reach the overview screen 23
Fig. 13: Overview screen 23
Fig. 14: How to reach the alarm and warning history 24
Fig. 15: Alarm and warning history 25
Fig. 16: How to chose an alarm or warning message 25
Fig. 17: How to scroll through stored messages 26
Fig. 18: Detailed information for a selected message 26
Fig. 19: How to reach the graphical temperature diagrams 32
Fig. 20: Temperature diagram of the pre-cooling unit 32
Fig. 21: Temperature diagram of the deep-cooling units 33
Fig. 22: How to reach the parameter menu (screen 1) 34
Fig. 23: Parameter menu, screen 1 34
Fig. 24: Parameter menu, screen 2 35
Fig. 25: How to reach the parameter settings 36
Fig. 26: How to reach the device information 37
Fig. 27: Device information 38
Fig. 28: Activating Service Reset (Qualified personnel only) 39
Fig. 29: Reset screen (Qualified personnel only) 39
Fig. 30: Min. assembly dimensions (unit with optional peristaltic pumps) 41
Fig. 31: Mounting rail for wall or rack mounting 42
Fig. 32: SR25.2: Mounting distance between pump motor and front panel 43
Fig. 33: Standard tubing: DCU 1 active, solenoid valve triggered, no FA 44
Fig. 34: Heat exchanger connectors (device with four optional peristaltic pumps) 45
Fig. 35: Tubing with purging: DCU 1 activ, solenoid valves triggered, no FA 46
Fig. 36: Heat exchanger connections, tubing with purging 47
Fig. 37: Electrical connections 50
Fig. 38: Temperature chart of the start-up stages 55
Fig. 39: Changing the pump tubing 59
Fig. 40: Resistor - temperature characteristic of the PT100 64
Fig. 41: Compressor: electrical connections 65
Fig. 42: Overview: screens 67

Table of Contents

Related product manuals