Swing-away lattice
3.4 Description of the rigging work
3 - 32 3 112 441 en Lattice extension operating instructions
GMK 4100/4100-L/5095
11.01.2008
When only section 2 is folded:
–In the
Middle area, the connection (3) is in the position section 2/main boom;
à p. 3 - 43.
–In the
rear area, the connection (1) between section 2 and the main boom
is established;
à p. 3 - 46.
The unneeded pins (2) are secured in the retaining sheet.