EasyManua.ls Logo

Maxon BMR Series - Page 80

Maxon BMR Series
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
STEP 16 - FINISH WELDING LIFTGATE TO VEHICLE
METHOD 2 & METHOD 3 - WELD LIFTGATE TO BODY - Continued
8. Reconnect power to the pump by
reconnecting positive (+) and nega-
tive (-) cables to battery (FIG. 80-1).
Reinstall and tighten nut when each
battery cable is reconnected.
POSITIVE (+)
BATTERY POST
BATTERY POWER RECONNECTED
FIG. 80-1
NEGATIVE (-)
BATTERY CABLE
NEGATIVE (-)
BATTERY POST
NUT
POSITIVE (+)
BATTERY CABLE

Table of Contents

Related product manuals