87
11921 Slauson Ave. Santa Fe Springs, CA. 90670 (800) 227-4116 FAX (888) 771-7713
STEP 18 - CHECK CLEARANCE OF RUNNER PADS -
Continued
11. Bolt upper pad to LH runner
with 2 bolts and 2 lock
washers (FIG. 87-1). Torque
the 2 bolts to 9-14 lb-ft.
BOLTING UPPER PAD
FIG. 87-1
UPPER
PAD
LH
RUNNER
BOLT &
LOCK WASHER
(2 PLACES)
12. Repeat instructions 5 to 11 for
RH column .
13. Raise the platform to bed height (FIG.
87-2). Then, lower the platform to
the ground (FIG. 87-2). Look for the
following conditions.
• Platform lowers smoothly.
• Platform lowers evenly on both sides
• Platform lowers in 8 to 20 seconds
(BMR-35/BMR-44) or
• Platform lowers in 12 to 23 seconds
(BMR-55/BMR-66).
CHECKING CLEARANCE OF RUNNER PADS
WITH PLATFORM BETWEEN BED
HEIGHT & THE GROUND
FIG. 87-2
14. When platform raises and
lowers correctly, reinstall LH
and RH runner covers (FIG.
87-2). Torque 6 bolts on each
runner cover to 9-14 lb-ft.
LH RUNNER
COVER
RH RUNNER
COVER