EasyManua.ls Logo

Mindray Accutorr V - Page 38

Mindray Accutorr V
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accutorr V Operating Instructions 0070-10-0699-02 3 - 9
Operation Patient Setup
FIGURE 3-8 MAINTENANCE dialog
4. Press (16) or (19) to highlight NIBP TOOLS to display the NIBP TOOLS
dialog as shown in FIGURE 3-9.
5. Once NIBP TOOLS is highlighted, press (18) to display the NIBP TOOLS dialog.
FIGURE 3-9 NIBP TOOLS Dialog
NOTE: The ACCURACY TEST, LEAK TEST, and CALIBRATION selection
shown the NIBP TOOLS dialog (FIGURE 3-9) are explained in
the Service Manual, part number 0070-10-0702. Calibration
should be carried out by qualified personnel only.
6. Press (16) or (19) to highlight INITIAL PRESSURE to display the INITIAL
PRESSURE dialog as shown in FIGURE 3-10.
7. Once INITIAL PRESSURE is highlighted, press (18) select it.
FIGURE 3-10 Example NIBP Cuff Initial Pressure Dialog

Table of Contents

Related product manuals