The initial process is for enabling data communications with connected devices by setting the minimum number of
parameters for the E71.
In the MELSEC-L series, the initial process is performed automatically.
(1) Checking the initial process result
The results of the initial process can be checked using the LEDs and I/O signals.
If the initial process is not normally completed, correct the set values of parameters listed in Chapter 7 and those
in the initial process setting parameter described in this chapter. After correcting the parameters, write them to the
CPU module again, power off and on the CPU module or reset the CPU module.
Appendix 4.1 Setting the initial process
Configure the setting in the initial setting window. Each setting time is calculated by "setting value 500ms".
Project window [Parameter] [Network Parameter] [Ethernet/CC IE Field] Select
"Ethernet" under "Network Type". button
Initial process INIT.LED
Initial normal completion
signal
(X19)
Initial abnormal end signal
(X1A)
Upon normal completion ON ON OFF
Upon abnormal end OFF OFF ON