MELSEC-Q
1   PRODUCT OUTLINE
1.2 Positioning control
1.2.1 Outline of starting
The outline for starting each control is shown with the following flowchart.
 It is assumed that each module is installed, and the required system configuration,
etc., has been prepared.
 
Machine OPR control
Fast OPR control
 
OPR control
 
 
 
Set the OPR data.
OPR. 1  to  
OPR. 9 
Preparation
 
Control 
functions
 
Flow of starting
 
Installation and connection of module
 
Setting of hardware
 
Position control
Speed-position 
switching control
Current value 
changing
Positioning control
 
 
JOG operation
 
Parameter
 
Positioning
data
 
 
OPR data
 
 
Control data
 
Start signal
 
Control start
 
Control end
 
 
 
 
Set the parameters.
Set the start method.( Da. 1  to  Da. 7 )
 
 
Operation
 
Stop
 
 
 
Turn ON the QD70 start signal
from the PLC CPU
Set the positioning data.
 
( Da. 1  to  Da. 7 )
Set the JOG data
( JOG. 1 to JOG. 4 )
JOG data
 
( Pr. 1  to  Pr. 10 )
   : Positioning control can make a 
    multiple axes simultaneous start.
    (Refer to "Section 9.3" for details.)
Turn the QD70 JOG
start signal ON from
the PLC CPU