How To Select Upstream Control Cha
ter Four: O
eration
52
Figure 22, page 51, shows the jumper block configured to operate with a normally closed
valve.
7.
Slide the enclosure over the unit and press it in place.
8.
Attach the hex nuts, removed in step 3, to the I/O connector.
9.
Reconnect the I/O cables.