EasyManua.ls Logo

Murr Elektronik CUBE20S PROFINET IO - Module Locking Mechanism

Murr Elektronik CUBE20S PROFINET IO
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting
User manual 57106_hdb_en_13 24 / 94
6.2.1 Functional principle of the locking
Inserting and locking the module
The terminal module has a locking lever at its top.
1 | For installation and disassembly, please press this locking lever upwards
until it engages audibly.
2 | Plug the module to be mounted in the previously plugged-in module.
3 | Slide the module with the help of the guide strips at top and bottom onto
the DIN rail.
4 | Flap the locking lever downwards.
The module is fastened to the DIN rail.

Table of Contents

Related product manuals