User Guide
44
www.nec-computers.com
Hold the thumbscrews on both sides of the server, and
install the server carefully while making sure of the installa-
tion position.
Note: During the first installation, you may feel strong
friction when pushing because the mechanical components
cannot completely engage with each other. Push the server
firmly.
6. Make sure that the sliding rails move smoothly by pulling the server out of the
rack and pushing it in several times.
Notes:
To install the server in the location adjacent to the other
device, pay attention to interference. If the installing server
disturbs the other devices already been installed, adjust the
position, and install the rail assembly again.
Make sure that the sliding rails move smoothly. If the sliding
rails are stuck to the rack frame and do not come out, rein-
stall them.
Installing the front bezel
1. Install the front bezel so that the left tab on the front bezel engages with the
chassis frame.
Figure 18: Installing the Front Bezel
A: Tabs
1
2
A