EasyManuals Logo

NEC iPasolink 200 User Manual

NEC iPasolink 200
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #119 background imageLoading...
Page #119 background image
CABLE TERMINATION 6-31
Installation NWD-107460-02E
(3) The gap of the connector body and clamp nut is confirmed.
(*) Gap: 2.2 to 2.7 mm
Note Do not remove the connector body tightened up once. When removing, it
is reworked from procedure 1 or a cable is exchanged.
Tools
spanner (16 mm)
torque spanner (16 mm)
clearance gauge, measure
(*): Check Point
Submission Prohibited
NEC Internal Use Only

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC iPasolink 200 and is the answer not in the manual?

NEC iPasolink 200 Specifications

General IconGeneral
BrandNEC
ModeliPasolink 200
CategoryNetwork Hardware
LanguageEnglish

Related product manuals