EasyManua.ls Logo

NEC SL1000 - Cable Routing and Clamping; Figure 2-24 Cabling; Figure 2-25 Sub-Cover

NEC SL1000
150 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.6.6 Cable Routing and Clamping
1. Depending on cabling requirement, select either a right or left route. Clamp and route cable to
outside.
Cables
Cable clamp
Figure 2-24 Cabling
2. Cut and remove the Plastic Knockouts as needed from the Sub-Cover.
Sub-Cover
Plastic Knockouts
Figure 2-25 Sub-Cover
3. Replace the Sub-Cover.
ISSUE 3.0 SL1000
Hardware Manual 2-19

Table of Contents

Other manuals for NEC SL1000

Related product manuals