For grounding purposes, make sure that your computer chassis provides excellent
conductivity between the power supply, the case, the mounting fasteners, and the
main board.
After accessing the inside of the system, close the system back up and secure it to
the rack unit with the retention screws after ensuring that all connections were made.
Rack-Mount Precautions
Follow these rack-mount precautions:
Make sure that the leveling jacks on the bottom of the rack are fully extended to the
floor with the full weight of the rack resting on them.
In single-rack installations, make sure that stabilizers are attached to the rack. In
multiple-rack installations, make sure that the racks are coupled together.
Always make sure that the rack is stable before extending a component from the
rack.
Extend only one component at a time. Extending two or more simultaneously might
cause the rack to become unstable.
Determine the placement of each component in the rack before you install the rails.
Install the heaviest components on the bottom of the rack first, and then work up.
Use a regulating uninterruptible power supply (UPS) to protect the ReadyNAS from
power surges and voltage spikes and to keep your system operating in case of a
power failure.
Allow any hot-plug drives and power supply modules to cool before touching them.
Always keep the rack's front door and all panels and components on the servers
closed when not servicing them to maintain proper cooling.