EasyManua.ls Logo

NETGEAR ReadyNAS 3220

NETGEAR ReadyNAS 3220
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(Continued)
Status IndicatorBoot Mode
Health
LED
UI LEDPower
LED
Description
Power and Health LEDs light.Volume read only
Power and UI LEDs lightMemory test
Power, UI, and Health LEDs light.Test disk
Legend:
Solid:
Blinking:
Off:
6.
Press and hold the Reset button to confirm your boot menu selection.
The system boots in the selected boot mode.
Rack-Mount Setup
Use the rack-mount hardware included with your ReadyNAS 3220 or 4220 storage
system to install it in a rack. Read Rack-Mount Precautions on page 126.
Danger: A system with installed drives can weigh more than 80 pounds. To avoid injury
or damage to the equipment, perform the rack-mount installation with appropriate
assistance.
Installation
Read these instructions in their entirety before you begin. Locate the shipping carton,
remove the rack-mounting kit, and prepare to work with it.
The rack-mounting kit contains two rail assemblies. Each assembly consists of two
sections:
An inner fixed chassis rail that secures directly to the system's chassis
An outer fixed rack rail that secures directly to the rack itself
Hardware Manual55ReadyNAS 3220 and 4220
ReadyNAS OS 6

Table of Contents

Related product manuals