(Continued)
Status IndicatorBoot Mode
Health
LED
UI LEDPower
LED
Description
Power and Health LEDs light.Volume read only
Power and UI LEDs lightMemory test
Power, UI, and Health LEDs light.Test disk
Legend:
•
Solid:
•
Blinking:
•
Off:
6.
Press and hold the Reset button to confirm your boot menu selection.
The system boots in the selected boot mode.
Rack-Mount Setup
Use the rack-mount hardware included with your ReadyNAS 3220 or 4220 storage
system to install it in a rack. Read Rack-Mount Precautions on page 126.
Danger: A system with installed drives can weigh more than 80 pounds. To avoid injury
or damage to the equipment, perform the rack-mount installation with appropriate
assistance.
Installation
Read these instructions in their entirety before you begin. Locate the shipping carton,
remove the rack-mounting kit, and prepare to work with it.
The rack-mounting kit contains two rail assemblies. Each assembly consists of two
sections:
•
An inner fixed chassis rail that secures directly to the system's chassis
•
An outer fixed rack rail that secures directly to the rack itself
Hardware Manual55ReadyNAS 3220 and 4220
ReadyNAS OS 6